Energy water and campus services

AVIS architectural development design · Tunisia

11 / 12Construction milestone
€250mConstruction investment payment
10%Share of €2.5bn construction
AVISPayDirect-IP payment workspace
Work package 11

Energy water and campus services

Provide the shared infrastructure that supports port operations, materials processing, manufacturing and the people who run them. The phase coordinates electrical distribution, process utilities, water systems, communications, maintenance facilities and workforce services with the demand of each work package. Energy and useful-heat recovery are developed through the campus service design. Buildings and landscape follow the AVIS architectural language while their internal layouts support practical use. The result is a connected service network that can accompany the programme’s progressive delivery and operating requirements.

Scope of delivery

  1. Develop electrical distribution, essential-service resilience and equipment connections from the coordinated campus load requirements.
  2. Install water, cooling, compressed-air and other process services specified by the industrial and terminal work packages.
  3. Provide maintenance, communications and workforce-support facilities connected to the operating areas they serve.
  4. Coordinate utility routing, metering, access and maintenance responsibilities across the shared campus infrastructure.

What this phase hands over

  1. Installed service networks with defined capacities, connection points and operating responsibilities for each receiving package.
  2. Equipment and maintenance information for power, water, process utilities and communications systems.
  3. Functional support spaces for maintenance teams, staff preparation and daily campus operations.
  4. A service handover register connecting utility systems with the commissioning and operating teams of the wider programme.
Additional construction view · Milestone 11

The work behind
the investment.

Energy water and campus services. This large construction view develops the work package within the expanded harbour and AVIS industrial-park masterplan.

Milestone 11 · Energy water and campus services · AVIS construction development
Construction payment 11 · 10%€250,000,000

AVIS-TN-11
Main construction investment including the harbour

Open this milestone in AVISPay
Detailed development programme

From design to delivery.

Services designed from demand

Use the equipment and operating requirements of the harbour and industry to define the service network. Electrical loads, process-water needs, cooling duties and compressed-air demand should connect directly to identifiable users. Metering provides a consistent view of consumption across the operating areas.

Useful energy within the process

Assess opportunities to recover useful heat and integrate energy systems within the campus design. Connect any recovery package to a defined source and user so it has a clear operating purpose. Maintenance and control interfaces belong in the same work package as the physical equipment.

A working environment for the team

Support daily operations with accessible staff facilities, training spaces, maintenance workshops and well-organised internal routes. Landscaped areas and the AVIS architectural identity can strengthen the campus experience while the planning remains centred on the activities and people each building serves.

Execution logistics

Connect the work.

Sequence major transformers, switchgear, cooling equipment and service modules against building access and lifting capacity. Keep principal service corridors accessible during installation and later maintenance. Coordinate shutdowns and connection activities with the work packages entering commissioning so each team receives a clear service handover.

Delivery interfaces

Milestone & handover

Campus-services milestone: shared utilities and support facilities are handed to the operating packages they serve.

The enabling layout reserves the service routes; industrial equipment and terminal requirements define the final connections and loads.