Form the deep-water approach and harbour basin.
Enfidha construction & industry / Phase 04 of 12

Form the deep-water approach and harbour basin.

Dredging and marine foundations

AVIS architectural development design · Tunisia

04 / 12Construction milestone
€200mConstruction investment payment
8%Share of €2.5bn construction
AVISPayDirect-IP payment workspace
Work package 04

Dredging and marine foundations

Develop the marine access and foundation works that give the Enfidha harbour its operating geometry. The work connects the approach channel, turning area, berth pockets and structural foundations into a coordinated marine construction sequence. The supplied design reference identifies 19 metres of access depth and a 900-metre turning basin. These reference dimensions support the planning of dredging, ground treatment and marine plant movements. The phase also establishes the connection between underwater work, shore construction access and the future quay and protection structures.

Scope of delivery

  1. Develop the dredging sequence for the approach, basin and berth areas within the coordinated marine layout.
  2. Plan seabed preparation, ground improvement and foundation construction for quay and harbour structures.
  3. Organise the handling, testing and designated management routes for material arising from marine excavation.
  4. Coordinate dredgers, survey craft, barges and shore support with the following structural construction packages.

What this phase hands over

  1. Marine work areas developed to the geometry and tolerances specified by the released engineering package.
  2. Survey records documenting the completed dredging surfaces, foundation positions and construction interfaces.
  3. Prepared foundation areas and ground-treatment records supporting the quay and harbour-protection structures.
  4. A marine handover register connecting completed underwater work with the next structural and terminal phases.
Additional construction view · Milestone 04

The work behind
the investment.

Dredging and marine foundations. This large construction view develops the work package within the expanded harbour and AVIS industrial-park masterplan.

Milestone 04 · Dredging and marine foundations · AVIS construction development
Construction payment 04 · 8%€200,000,000

AVIS-TN-04
Main construction investment including the harbour

Open this milestone in AVISPay
Detailed development programme

From design to delivery.

From approach to berth

Treat channel access, vessel turning and the berth pockets as a continuous marine system. Construction sequencing should preserve access for the equipment completing each area and for the following works. Survey information connects the dredging operation with the design model and its dimensional requirements.

Foundations for heavy operations

Quay structures and cargo-handling systems introduce substantial concentrated loads at the water’s edge. Coordinate marine foundations with structural grids, crane rails and service routes before those interfaces become fixed. Record the completed positions and conditions for the next construction team.

A coordinated material route

Marine excavation produces material flows that need their own handling plan. Define the classification, transport and destination of each material stream within the engineering package. Keep these marine-construction flows distinct from the industrial feedstocks that will later enter the waste-to-nanopowder operation.

Execution logistics

Connect the work.

Plan marine plant movements and support facilities as one operating system. Define survey coverage, barge routes, temporary berths and shore transfer points. Coordinate weather windows, maintenance needs and the sequence of structural deliveries so dredging and foundation activities support each other throughout the work.

Delivery interfaces

Milestone & handover

Marine-works milestone: surveyed dredging and foundation areas are released for quay and protection structures.

Marine engineering defines the required geometry; enabling works provide shore access, services and support areas.

AVIS TUNISIA · ARCHITECTURAL GALLERY