Reform the existing facility for the NoAge manufacturing programme.
Supporting industry / PERLAMED · Sbikha · Kairouan

Reform the existing facility for the NoAge manufacturing programme.

Pharmaceutical industry development

AVIS architectural development design · Tunisia

€10mPharmaceutical acquisition
€8mIndustrial equipment
SbikhaKairouan · Tunisia
NoAgeManufacturing development
Supporting industry / PERLAMED · Sbikha · Kairouan

Pharmaceutical industry development

The pharmaceutical acquisition creates an industrial base for the owner’s NoAge nano-medical product development programme. The project starts with the existing building and its documented production, laboratory and utility spaces, then develops the refurbishment and equipment programme around the intended manufacturing activities. The acquisition allocation is €10 million, with a further €8 million assigned to additional industrial equipment. Existing-facility images provide the physical reference for the new AVIS development views, preserving the recognisable building while improving its architectural expression and operational organisation.

Scope of delivery

  1. Organise the building and asset handover around the production areas, laboratories, storage, utilities and access included in the acquisition.
  2. Develop the refurbishment layout around the intended manufacturing processes, people, materials and maintenance routes.
  3. Coordinate the NoAge product-development scope with the production, analytical, handling and packaging capabilities to be installed.
  4. Connect the building programme with the separate €8 million industrial-equipment package and its installation requirements.

Work package deliverables

  1. A building and asset register connecting the acquired spaces and installations with the planned refurbishment work.
  2. Coordinated layouts for production, laboratories, stores, staff access, utilities and maintenance.
  3. A defined refurbishment programme showing retained installations, alterations and the equipment interfaces to be prepared.
  4. A facility handover package linking the completed spaces with their manufacturing, quality and operating teams.
Pharmaceutical industry development · AVIS development design
Detailed development programme

From design to delivery.

Build from the existing facility

The supplied photographs show an established industrial building with production rooms, process corridors, storage and analytical laboratories. They also document air treatment, cooling, compressed air, boilers and purified-water systems. Use this actual physical foundation to develop the refurbishment and the improved AVIS architectural treatment.

A manufacturing brief for NoAge

Translate the owner’s NoAge nano-medical and peptide development direction into an equipment and production brief. Define the intended product families, material requirements, analytical work and packaging sequence. This brief guides the space planning and technical systems needed for the manufacturing development programme.

Retain, adapt and add

Review each existing space and installation against its future role. Retained systems become part of the facility inventory; alterations receive a defined work scope; new equipment receives a coordinated installation interface. The design programme brings these decisions together in a practical plan for the completed facility.

NoAge manufacturing development

Equip the facility.
Develop the production capability.

The €8 million equipment programme adds the industrial systems and laboratories required by the intended pharmaceutical and nano-medical manufacturing workstream.

The development connects production rooms, controlled services, analytical work, packaging and material movement. It builds from the supplied host facility and its existing industrial arrangement.

Explore equipment & laboratories
AVIS development design based on the supplied host-industry equipment references.
The wider NoAge programme

Manufacturing connected
to the AVIS healthcare programme.

PERLAMED’s development supports the intended manufacture of nano-medical and peptide products for NoAge.

The pharmaceutical workstream connects to the AVIS healthcare activity presented in Building 22 and the group’s healthcare programme for team members.

Execution logistics

Connect the work.

Plan the movement of equipment and construction materials around the existing building’s access and internal circulation. Coordinate changes to technical services with the spaces they supply. Prepare installation routes, temporary protection and service connections before the new equipment arrives, while keeping the overall refurbishment sequence visible to the acquisition and production teams.

Delivery interfaces

Milestone & handover

Pharmaceutical programme: €10 million acquisition, coordinated refurbishment and a separate €8 million industrial-equipment package.

Coordinate this work package with the programme office and its connected operating teams.

AVIS TUNISIA · ARCHITECTURAL GALLERY