The vertical centre of a connected industrial city.
AVIS Tunisia / Expanded harbour & industrial masterplan

The vertical centre of a connected industrial city.

AVIS Towers and infrastructure

AVIS architectural development design · Tunisia

AVISIntegrated tower district
3D printingArchitectural development language
ConnectedIndustry · Transport · Services
EnfidhaExpanded harbour & industrial park
Expanded masterplan development

AVIS Towers and infrastructure

The AVIS Towers bring engineering, research, programme leadership, financial operations and workforce services into the high-tech industrial park. Sculpted printed structures, gold structural ribs, glass and planted terraces establish the shared architectural language of the harbour and its industrial campus.

AVIS Towers · Architectural development within the expanded Enfidha industrial masterplan
Detailed development programme

From design to delivery.

Architecture with a shared identity

Develop the towers through flowing white printed surfaces, exposed gold structural ribs, glass and planted terraces. Connect their podiums with shaded pedestrian spaces and the industrial campus without isolating the tower district from the work it supports.

Programme spaces that support the industry

Organise research, engineering, project leadership, finance, training and workforce services around clear operating relationships. Provide spaces for collaboration, controlled technical work, programme meetings and day-to-day campus services.

Infrastructure from the ground upward

Coordinate tower foundations, service entries, structural fabrication, vertical circulation and maintenance access with the campus utility corridors. Reserve installation and replacement routes so the buildings remain part of the shared operating infrastructure.

Programme functions within the tower district

Research. Engineering.
Capital. People.

Research & advanced materials

Development teams and analytical support connecting material qualification, product development and the manufacturing campus.

Engineering & programme control

Project leadership, design coordination, construction interfaces and the records supporting each delivery milestone.

Financial & AVISPay operations

Programme finance and payment services linked to the bank infrastructure, GENESIS custody workstream and milestone references.

Healthcare & workforce services

Workforce support and healthcare-programme coordination connected to the wider AVIS and NoAge development.

Training & industrial skills

Training spaces and technical collaboration for construction, robotic manufacturing, maintenance and operating teams.

Logistics coordination

Harbour, rail, road and industrial dispatch coordination within the wider merchant transport network.

The common infrastructure

Connect every tower
to the working campus.

The tower district is developed with the same transport, service and operating interfaces as the harbour and high-tech industrial park.

Roads & freight rail

Coordinate service access and industrial freight routes with safe pedestrian and workforce movement.

Energy

Connect building demand, manufacturing systems, generation, distribution and maintenance arrangements.

Water & service networks

Plan process-water, building services, drainage and treatment interfaces across the shared campus.

Digital & payment infrastructure

Provide the communications and controlled operating interfaces needed by industrial systems and AVISPay programme workflows.

AVIS TUNISIA · ARCHITECTURAL GALLERY