A harbour on a new scale.
AVIS Tunisia / Expanded harbour & industrial masterplan

A harbour on a new scale.

Expanded deep-sea harbour

AVIS architectural development design · Tunisia

20×Expanded harbour footprintMasterplan design objective
3Construction completion stages
12Linked construction payment milestones
€2.5bnCombined construction investmentHarbour & advanced industry
Expanded masterplan development

Expanded deep-sea harbour

The Enfidha masterplan expands the harbour footprint to twenty times the previous AVIS concept. Its marine basins, terminals and transport network connect directly with a high-tech industrial park, AVIS Towers and the infrastructure of a major coastal development. The harbour follows three defined construction completion stages within the twelve-payment construction programme.

Step-by-step harbour construction

Three completion gates.
One enlarged masterplan.

The sequence develops the same harbour layout from its marine structures through terminals and freight connections to integrated completion. Programme mobilisation, engineering and enabling works prepare the first gate.

Planned construction completion 1 / 3

Marine works completed.

Establish the protected deep-sea harbour.

Stage 1 of 3 · AVIS expanded harbour construction development

Complete the marine access, protected basins, breakwaters and quay foundations that establish the expanded harbour footprint. The first completion gate gives the terminal construction programme a continuous marine and structural base.

Completion scope

  1. Protected approach, basins and marine circulation arranged within the enlarged masterplan.
  2. Breakwater and quay structures with the working interfaces required by the terminal programme.
  3. Marine foundations, access provisions and quay service interfaces ready for equipment and superstructure installation.
Linked construction milestone payments
Planned construction completion 2 / 3

Terminals and freight connections completed.

Connect the quays to the industrial network.

Stage 2 of 3 · AVIS expanded harbour construction development

Complete the terminal buildings, cargo-handling installations, working yards, rail interfaces and road connections. AVIS printed structures and terminal systems form the operating link between the marine basins and the high-tech industrial park.

Completion scope

  1. Container and multipurpose terminal structures with their cargo-handling interfaces.
  2. Rail sidings, road interchanges, dispatch yards and industrial delivery routes.
  3. Terminal superstructures and working areas coordinated with the AVIS Towers and industrial-park access plan.
Linked construction milestone payments
Planned construction completion 3 / 3

Integrated harbour and campus completed.

Bring the complete development into operation.

Stage 3 of 3 · AVIS expanded harbour construction development

Complete the harbour as an integrated development with energy, water, digital systems, industrial connections and the AVIS Towers district. The final gate connects the completed physical works with testing, operational preparation and coordinated handover.

Completion scope

  1. Connected energy, water, communications and operating services for harbour and campus.
  2. Integrated cargo movement between the deep-sea terminals, rail, roads and advanced industry.
  3. Completed construction records, operating arrangements, testing and handover for the connected programme.
Linked construction milestone payments
Harbour, AVIS Towers & high-tech industry

The gateway and
the city around it.

The port connects directly with the industrial park, tower district and shared infrastructure.

Plan cargo movement, manufacturing access, people, energy, water and digital services as connected systems. The same construction references follow each work package through its presentation, completion scope and AVISPay instruction.

Explore the high-tech industrial park