Construct the harbour-protection and quay structures that connect deep-water access with cargo operations on land. The supplied port reference provides a five-kilometre quay planning basis, comprising 3.6 kilometres for container activity and 1.4 kilometres for bulk and multipurpose handling. The structural programme develops these interfaces with vessel berthing, crane systems, heavy vehicles and utilities in view. AVIS architectural expression is introduced through terminal buildings and public-facing structures while the marine edge remains organised around robust operation, access and maintenance.
Scope of delivery
Deliver breakwater and protection structures in coordination with the basin, approach and coastal engineering design.
Construct the container, bulk and multipurpose quay systems with their foundations, decks and operational interfaces.
Incorporate crane-rail supports, mooring systems, fenders, service trenches and maintenance access into the structural packages.
Coordinate heavy lifting, marine construction and landside assembly areas with progressive terminal development.
What this phase hands over
Completed harbour-protection sections and quay structures with documented construction and survey records.
Berthing interfaces, crane support systems and utility provisions coordinated with the cargo-handling package.
Defined structural handover areas for terminal equipment, pavement and operational-building installation.
Maintenance and inspection information for the marine structures, embedded systems and accessible service routes.
Additional construction view · Milestone 05
The work behind the investment.
Breakwaters and quay structures. This large construction view develops the work package within the expanded harbour and AVIS industrial-park masterplan.
Milestone 05 · Breakwaters and quay structures · AVIS construction development
Construction payment 05 · 12%€300,000,000
AVIS-TN-05 Main construction investment including the harbour
Different cargo operations require distinct working envelopes. Coordinate crane positions, vessel services, cargo transfer and maintenance routes for each berth type. The planning split between container and multipurpose frontage provides a structure for developing these operationally specific construction details.
Industrial fabrication and assembly
Use the programme’s manufacturing strategy to identify components suitable for repeatable fabrication and controlled assembly. Structural connections, service modules and building elements can be coordinated with the AVIS robotic-manufacturing workstream while their engineering requirements remain defined by their actual duty.
Structures ready for equipment
Every terminal interface should be identified before its supporting structure is completed. Fixing points, loads, cable routes and replacement access connect the civil works to the future equipment. Handover information allows installers to work from recorded conditions and coordinated dimensions.
Execution logistics
Connect the work.
Plan the movement of large structural elements, reinforcement, concrete and marine plant through designated assembly and transfer zones. Coordinate lifts with available working radii and quay access. Release completed sections progressively so terminal installation can follow the structural work in an orderly sequence.
Delivery interfaces
Milestone & handover
Structural milestone: defined quay and protection sections are handed over for terminal systems and cargo equipment.
Dredging, ground treatment and marine foundations provide the construction interfaces for the quay and protection systems.