Open the programme. Establish the delivery team.
Enfidha construction & industry / Phase 01 of 12

Open the programme. Establish the delivery team.

Programme mobilisation

AVIS architectural development design · Tunisia

01 / 12Construction milestone
€5mConstruction investment payment
0.2%Share of €2.5bn construction
AVISPayDirect-IP payment workspace
Work package 01

Programme mobilisation

The Enfidha programme brings a deep-water harbour, advanced materials production and robotic manufacturing into one coordinated delivery plan. Mobilisation establishes the people, surveys, engineering packages and site arrangements needed to move from the project brief into ordered execution. Construction milestone 01 carries a €5 million allocation within the €2.5 billion construction schedule. The additional €5 million kickoff package is a separate payment with its own reference. Banking and pharmaceutical acquisitions begin as connected supporting programmes, each with its own scope and payment record. The separate FreePort development is presented alongside the harbour programme through its own project page.

Scope of delivery

  1. Establish the programme office, technical leads and work-package responsibilities for marine construction, industrial systems and supporting acquisitions.
  2. Prepare the first engineering commissions, survey briefs, site-access arrangements and document-control structure.
  3. Organise the early bank and pharmaceutical acquisition workstreams around the intended operating requirements of the wider programme.
  4. Link construction milestone 01 (€5 million) and the additional kickoff package (€5 million) to their separate AVISPay payment references.

What this phase hands over

  1. A coordinated delivery register identifying each work package, its lead and the interfaces it must resolve.
  2. Survey and design briefs covering the harbour, industrial campus, transport connections and site services.
  3. A mobilisation schedule connecting the first engineering activities with acquisition and operational-preparation work.
  4. Separate construction-milestone and additional-kickoff payment records carrying their own references, amounts, currencies and processing histories.
Additional construction view · Milestone 01

The work behind
the investment.

Programme mobilisation. This large construction view develops the work package within the expanded harbour and AVIS industrial-park masterplan.

Milestone 01 · Programme mobilisation · AVIS construction development
Construction payment 01 · 0.2%€5,000,000

AVIS-TN-01
Main construction investment including the harbour

Open this milestone in AVISPay
Detailed development programme

From design to delivery.

One programme, connected work packages

Organise the harbour and industrial centre around their physical connections: vessel access, cargo transfer, material reception, processing and manufacturing. The programme office maintains the interface register so a change to one package is carried through to affected utilities, roads and equipment layouts.

Early acquisition coordination

Bring the bank and pharmaceutical workstreams into mobilisation from the outset. The bank supports bond custody and construction-payment services; the pharmaceutical facility supports the NoAge manufacturing development programme. Acquisition teams define their handover inventories and integration requirements alongside the construction leads.

Payment and delivery records

Give each programme package a stable reference shared by its presentation page, delivery register and AVISPay instruction. Construction milestone 01 and the additional kickoff allocation have separate references and appear once each in the financial schedule. Their work scope and payment history remain associated as the programme develops.

Execution logistics

Connect the work.

Use a shared programme calendar for engineering visits, survey teams, acquisition inspections and local site coordination. Establish practical routes for personnel, survey equipment and early temporary facilities before heavier construction movements begin. Keep marine and landside mobilisation responsibilities visible in the same delivery sequence.

Delivery interfaces

Milestone & handover

Construction milestone 01: programme mobilisation and coordinated engineering work. The additional kickoff package is recorded separately.

This opening phase establishes the delivery framework used by every subsequent phase.

Additional programme allocation

A dedicated
€5 million kickoff.

Launch the programme office, early project development and the coordination of the acquisition workstreams.

This additional allocation has its own AVIS-TN-KICKOFF reference. It is added to the €2.5 billion construction schedule, whose first €5 million tranche carries the separate AVIS-TN-01 reference.

View the complete investment schedule →