AVIS Tunisia · Enfidha Africa Gateway
A new harbour.
A new industrial landscape.
Tunisia / Enfidha / Central Mediterranean

A new harbour. A new industrial landscape.

A harbour masterplan expanded to 20 times the previous footprint. AVIS Towers and a high-tech industrial park. €2.5 billion of main construction investment across twelve milestone payments.

AVIS architectural development design · Tunisia

€2.5bnMain construction including harbour
12Construction payment milestones
€58mAdditional programme allocations
AVISPayDirect-IP payment workspace
The Enfidha development programme

Where maritime trade
becomes industrial opportunity.

The harbour is the gateway. The industry creates the next use for the materials moving through it.

AVIS brings deep-water port construction, material recovery and advanced manufacturing into a connected programme. The architecture follows our sculptural, 3D-printed design language, adapted to the Tunisian coast and its transport networks.

Bank infrastructure supports the GENESIS Green Bond and construction payments. PERLAMED provides the pharmaceutical development platform for NoAge. Each has its own work package within the wider programme.

Explore the twelve construction milestones →
01Receive maritime cargo
02Recover useful materials
03Produce nanopowder
04Print & manufacture
05Connect to markets
The maritime foundation

A gateway between
Africa and Europe.

Protected marine access, container and multipurpose quays, efficient cargo transfer and inland transport connections form the harbour’s development brief.

The programme links that gateway to high-technology industry and the wider Pan-African and Arab merchant transport network.

Explore the terminal programme →
20×Expanded harbour footprintMasterplan design objective
3Harbour completion stagesMarine works · Terminals · Integration
AVIS TowersHigh-tech industrial parkResearch · Engineering · Programme services
IntegratedTransport & campus infrastructureRail · Roads · Energy · Water · Digital
Twentyfold harbour expansion · A connected industrial city

Harbour. Industry.
AVIS Towers.

Explore the enlarged masterplan, the three harbour construction-completion stages and the high-tech industrial park with its tower district and shared infrastructure.

Construction investment & engineering webshop

€2.5 billion.
Twelve construction milestones.

Explore the construction images, scope and development plan for every phase. Each investment payment follows the twelve-part milestone schedule and opens directly in AVISPay.

12 of 12 construction milestones

Main construction investment · Harbour & advanced industry

€2.5 billion.
Twelve construction payments.

The main construction investment includes the Enfidha harbour and advanced-industry works. Each milestone carries its amount, share and dedicated reference into AVISPay’s direct-IP payment workspace.

Construction investment milestone payment schedule
PhaseConstruction work packageInvestment paymentShareCumulative allocationPayment workspace
01Programme mobilisationAVIS-TN-01€5,000,0000.2%€5,000,000Open in AVISPay
02Masterplan and engineeringAVIS-TN-02€45,000,0001.8%€50,000,000Open in AVISPay
03Site access and enabling infrastructureAVIS-TN-03€100,000,0004%€150,000,000Open in AVISPay
04Dredging and marine foundationsAVIS-TN-04€200,000,0008%€350,000,000Open in AVISPay
05Breakwaters and quay structuresAVIS-TN-05€300,000,00012%€650,000,000Open in AVISPay
06Terminals and cargo handlingAVIS-TN-06€350,000,00014%€1,000,000,000Open in AVISPay
07Rail road and airport interfacesAVIS-TN-07€300,000,00012%€1,300,000,000Open in AVISPay
08Material reception and recoveryAVIS-TN-08€250,000,00010%€1,550,000,000Open in AVISPay
09Nanopowder processing and qualificationAVIS-TN-09€300,000,00012%€1,850,000,000Open in AVISPay
10Robotic 3D printing and manufacturingAVIS-TN-10€250,000,00010%€2,100,000,000Open in AVISPay
11Energy water and campus servicesAVIS-TN-11€250,000,00010%€2,350,000,000Open in AVISPay
12Integrated commissioning and operationAVIS-TN-12€150,000,0006%€2,500,000,000Open in AVISPay
Total construction investment€2,500,000,000100%€2,500,000,00012 milestones
Additional kickoff, bank & pharmaceutical payments

Finance the bank.
Develop the pharmaceutical industry.

These four packages add €58 million to the main €2.5 billion construction investment, which includes the harbour and advanced-industry works.

Pharmaceutical industrial equipment
Equipment · AVIS Tunisia

Pharmaceutical industrial equipment

€8,000,000

Add industrial equipment and laboratories for the NoAge manufacturing programme.

Open in AVISPay View the work package
€58,000,000 · Four additional programme allocations.Explore the payment workflow →

€2,558,000,000Main construction investment including the harbour, plus the four additional allocations.

Bank development payment package

Refurbishment & operating integration

Prepare the bank’s working environment, technology infrastructure, custody operations and connection to AVISPay as a dedicated work package.

Open refurbishment in AVISPay View the bank development scope
Bank capital-increase package
€100 million

Target share capital

The capital increase is calculated in AVISPay from the bank’s existing capital position to the target level, with its own payment reference.

Open capital increase in AVISPay View the capital programme

Bank refurbishment and the capital increase follow their own financial scope. The additional FreePort is a separate project →

Advanced materials & robotic manufacturing

From recovered material
to printed industry.

A purpose-built industrial chain connects waste reception to nanopowder preparation and the manufacture of new products.

The development brings together material identification, sorting, preparation, VORTEX processing, separation, laboratory qualification and controlled feedstock delivery. Robotic 3D printing turns those qualified materials into components, structures and industrial products.

Explore robotic manufacturing →
AVIS development design · Robotic fabrication and industrial architecture
The programme connection

One material journey.
Many industrial applications.

The harbour, transport and manufacturing work packages meet at defined physical interfaces.

Enfidha harbour and industrial material flowMarine cargo enters port terminals, then connects to freight distribution and material reception. Material preparation feeds nanopowder processing and robotic 3D printing. Bank and AVISPay services support all work packages. PERLAMED is a connected pharmaceutical programme at Sbikha.Marine gatewayAfrica · Europe · Arab marketsPort terminalsContainer · multipurpose cargoFreight connectionsRail · road · regional logisticsMaterial receptionIdentification · sorting · preparationNanopowder industryProcessing · laboratory qualificationRobotic 3D printingConstruction · componentsIndustrial productsManufacturing · distributionConnected marketsAfrica · Mediterranean · globalBank & AVISPay · Programme payments | PERLAMED · NoAge manufacturing development

Marine & transport

Connect berth operations to cargo handling, rail sidings, road access and regional distribution.

Materials & manufacturing

Move identified material through preparation, nanopowder production, quality control and robotic fabrication.

Programme services

Coordinate power, water, maintenance, workforce services and the financial infrastructure supporting delivery.

Supporting industrial acquisition / Sbikha · Kairouan

PERLAMED.
The NoAge manufacturing programme.

The pharmaceutical acquisition and equipment programme prepares the facility for the intended nano-medical and peptide-product manufacturing workstream.

The new architecture develops the actual host building’s form, with a dedicated refurbishment, industrial equipment and laboratory programme.

€10mAcquisition
€8mIndustrial equipment
Explore the pharmaceutical project →
AVIS development design · Banking infrastructure and operations
The financial infrastructure

Bond custody.
Capital movements.
Construction payments.

The bank programme connects the GENESIS Green Bond to the operating needs of a major construction and industrial development.

Acquisition, refurbishment, capitalisation and AVISPay integration form distinct work packages, with payment instructions linked to their programme references.

€35mBank acquisition
€100mShare-capital target
Explore the bank programme →
Separate additional project

The industrial
FreePort.

A distinct programme for industrial logistics, merchant activity and connected manufacturing, serving the Pan-African and Arab transport network.

Its development scope, milestones and financial structure are organised as an additional project alongside the harbour programme.

Explore the additional FreePort project →
Delivery sequence

Build the interfaces.
Then bring them together.

MILESTONES 01–03

Mobilise & engineer

Programme leadership, masterplan, engineering, site access and enabling services.

MILESTONES 04–07

Construct the gateway

Dredging, marine structures, terminals and freight transport connections.

MILESTONES 08–10

Develop the industry

Material reception, nanopowder preparation and robotic manufacturing.

MILESTONES 11–12

Integrate & operate

Campus services, operational preparation and coordinated commissioning.

The revised architectural masterplan expands the earlier harbour footprint twentyfold and connects it with the AVIS Towers, high-tech industrial park and shared infrastructure.

AVIS TUNISIA · ARCHITECTURAL GALLERY