A place to live, work and belong.

Living campus for 5,000+ people

Explore this phase ↓
AI-generated architectural development visualization based on AVIS.Land and supplied AVIS designs.
€300,000,000Phase allocation
Progressive deliveryPackage execution
09 / 12Delivery sequence
EURTranche currency
Coastal site

Living campus for 5,000+ people

Develop the accommodation and daily services needed to support at least 5,000 people within the wider campus programme. Plan residential life around safe access, public space and reliable infrastructure.

Scope of delivery

  1. Develop residential neighbourhoods and shared amenities
  2. Install water, wastewater, waste collection and local mobility services
  3. Provide food, retail, recreation and community spaces
  4. Create accessible routes and separation from industrial operations

What this phase hands over

  1. Accommodation and service-capacity schedule
  2. Completed building and utility packages
  3. Accessibility and life-safety inspection records
  4. Phased occupancy and facilities-management plan

Part of the active programme

The programme began in 2005 and continues through 2026 with ongoing development activity and expenditure. Its former waste-to-petrol route will not be executed. The current programme develops waste-to-nanopowder, advanced manufacturing, alternative-energy systems and the supporting campus infrastructure.

Programme expenditure is covered by the GENESIS Green Bond.

The project is now moving onto the AVIS platform to bring industrial companies, engineering teams and universities into coordinated delivery packages. Participants contribute manufacturing capability, engineering, research, testing and training through defined scopes and interfaces.

Execution logistics

Move with a plan.

Hand over occupied zones independently from construction areas. Match each occupancy release to potable water, wastewater, emergency access and facilities staffing.

Completion & payment milestone

Accepted occupancy packages demonstrate the agreed cumulative capacity and operational services; 5,000+ is the programme target, not a claim of existing occupancy.

Delivery responsibility: Campus development lead · utilities engineer · facilities manager.
Predecessor phases: 02, 03, 07.
The programme is already underway. Package dates and progress follow the current execution register; no new project start is implied.

Detailed development brief

Engineering the AVIS industrial city.

Living infrastructure for 5,000+ people

Coordinate accommodation, potable water, wastewater, food, retail, recreation, waste collection and emergency services against the owner’s population target. Occupancy is released in serviced zones rather than assumed from the appearance of a tower.

The AVIS spiral buildings

Develop the supplied planted terrace and curved-glass tower language with maintainable façade access, structural load paths, vertical transport, accessible routes and irrigation. Integrate workplaces and shared spaces without exposing residential circulation to industrial hazards.

A connected waterfront community

Create shaded pedestrian routes, landscape buffers and mobility connections between homes, research and work. Keep heavy rail, cargo and truck traffic on protected industrial routes with controlled crossings.

Supplied AVIS architecture and engineering reference
Supplied AVIS reference: d4-reference-61.webp. Earlier Motril / international designs inform the Italian programme; this is not an approved Italian construction drawing.
Construction interfaces

From the harbour to the process hall.

The owner’s design brief combines principal 250 × 250 metre processing halls, a programme of 500 VORTEX mills, robotic kinetic-fusion printing and heavy maritime, rail and truck logistics.

PRINCIPAL HALL • 250 × 250 mModule 0125 unitsModule 0225 unitsModule 0325 unitsModule 0425 unitsModule 0525 unitsModule 0625 unitsModule 0725 unitsModule 0825 unitsModule 0925 unitsModule 1025 unitsModule 1125 unitsModule 1225 unitsModule 1325 unitsModule 1425 unitsModule 1525 unitsModule 1625 unitsModule 1725 unitsModule 1825 unitsModule 1925 unitsModule 2025 units62,500 m² envelope • 20 illustrative modules × 25 mills = 500Module arrangement is conceptual; equipment fit and clearances are not verified.LARGE HARBOUR + SHIPPINGHEAVY RAIL + TRUCK RECEIVINGSORTING → MILLING → POWDERROBOTIC PRINTING + PLATFORMSPhase 09 interface study • not a construction drawingWater areas and marine works are outside this hall schematic.

Engineering work package

Confirm structural grids, equipment foundations, loading paths, service capacities and maintainable access. Validate the mill count and production configuration through the equipment register and vendor drawings.

Marine and transport interfaces

Coordinate harbour works, shipbuilding and heavy platforms with rail access and truck circulation. This is a planning diagram, not a surveyed layout or approved engineering drawing.

Original AVIS construction referenceAVIS source construction reference

18012026390810ProjectSumary.pdf, page 61. International reference design; source dimensions and capacities are not automatically adopted for the Italian site.

AVIS architectural identity

The development, visualised.

Photorealistic views connect this work package to the waste facility, maritime industry and wider campus. Select an image to inspect it.

Original document images — design references

These original source illustrations are retained for traceability; they are not site photographs.

Source and scope notes

D1 p2; D3 pp3,14,17; owner capacity brief. D1: The projectDev; D2: Italian Prototyping Nanopowder from Waste Project; D3: Project Description. The phase breakdown, milestones and budget allocation are newly proposed for the owner’s current brief.

The coastal parcel is described by the owner as approximately 30 km south of Salerno. Exact boundaries, site control and construction authorisations are not established by the supplied documents. Concept imagery from other AVIS programmes illustrates the design language only.