AVIS industrial city concept
Italy / Sarno → Salerno coastal corridor

Build the next
industrial landscape.

Waste-to-nanopowder. Advanced manufacturing. Alternative energy. A connected campus planned for at least 5,000 people.

Explore the 12 phases ↓
Photorealistic AVIS development visualization · AI-generated from AVIS references, not an existing-site photograph.
€2.5bnProgramme envelope
100 haOwner’s land brief
5,000+People to support
12Phase payment packages
Two locations. One delivery programme.

Prove in Sarno.
Scale on the coast.

Sarno anchors the prototype, laboratory and first production trials. The larger development is planned for a coastal location approximately 30 km south of Salerno, bringing industrial production and the infrastructure of daily life into one coordinated campus.

A complete material journey

  1. Receive, identify and qualify incoming material.
  2. Sort, prepare, mill and separate defined fractions.
  3. Characterise powders and qualify manufacturing processes.
  4. Produce, inspect, warehouse and dispatch finished products.
  5. Support the industry with energy, research, training and living infrastructure.
Heavy industrial development

The AVIS harbour.
The waste facility.
The manufacturing city.

Principal process halls: 250 × 250 metres. VORTEX programme: 500 mills. Robotic kinetic-fusion printing, major harbour terminals, heavy floating platforms, shipbuilding, rail freight and truck logistics form one coordinated development vision.

The 100-hectare brief describes the onshore programme. Harbour basin, water areas and marine works require a separate boundary and engineered scope. The twelve financial allocations remain the proposed division of the overall €2.5 billion programme, including incurred and committed expenditure.

Construction & Engineering webshop

Twelve phases.
One integrated future.

Each phase page brings together its construction scope, logistics, acceptance milestone, source imagery and payment setup. Work packages may overlap where their design and site interfaces are released.

AVIS phase 01 project reference
Phase 01 · Progressive delivery

Sarno • The proving ground

€5,000,000

Sarno →

AVIS phase 02 project reference
Phase 02 · Progressive delivery

Masterplan & delivery engineering

€45,000,000

Sarno + coastal site →

AVIS phase 03 project reference
Phase 03 · Progressive delivery

Site access & enabling works

€100,000,000

Coastal site →

AVIS phase 04 project reference
Phase 04 · Progressive delivery

AVIS process halls & structural construction

€200,000,000

Coastal site →

AVIS phase 05 project reference
Phase 05 · Progressive delivery

Receiving, sorting & feed preparation

€300,000,000

Coastal site →

AVIS phase 06 project reference
Phase 06 · Progressive delivery

VORTEX production & powder refinement

€350,000,000

Coastal site + Sarno support →

AVIS phase 07 project reference
Phase 07 · Progressive delivery

Energy infrastructure & manufacturing

€300,000,000

Coastal site →

AVIS phase 08 project reference
Phase 08 · Progressive delivery

Robotic kinetic-fusion printing & shipbuilding

€250,000,000

Coastal site + Sarno laboratory →

AVIS phase 09 project reference
Phase 09 · Progressive delivery

Living campus for 5,000+ people

€300,000,000

Coastal site →

AVIS phase 10 project reference
Phase 10 · Progressive delivery

University, healthcare & innovation

€250,000,000

Coastal site + Sarno research link →

AVIS phase 11 project reference
Phase 11 · Progressive delivery

Large harbour, rail & heavy logistics

€250,000,000

Both sites + regional logistics →

AVIS phase 12 project reference
Phase 12 · Progressive delivery

Integrated commissioning & handover

€150,000,000

Whole programme →

Active programme · Started 2005

Already in motion.
Now connected through the platform.

Continuing execution

The programme began in 2005 and continues through 2026 with ongoing development activity and expenditure. Its former waste-to-petrol route will not be executed. The current programme develops waste-to-nanopowder, advanced manufacturing, alternative-energy systems and the supporting campus infrastructure.

GENESIS Green Bond

Programme expenditure is covered by the GENESIS Green Bond.

Industrial and academic participation

The project is now moving onto the AVIS platform to bring industrial companies, engineering teams and universities into coordinated delivery packages. Participants contribute manufacturing capability, engineering, research, testing and training through defined scopes and interfaces.

Twelve coordinated work packages

The phase pages organise the continuing development, expenditure and participant responsibilities. They do not restart the project or assume that every package has reached the same stage.

Exact programme reconciliation

€2,500,000,000.
Allocated across 12 tranches.

Weighted phase allocations match the proposed work packages. The first €5 million follows the supplied Sarno prototype budget; the remaining allocations are proposed within your current €2.5 billion total.

PhasePackageShareTrancheCumulative
01Sarno • The proving ground0.2%€5,000,000€5,000,000
02Masterplan & delivery engineering1.8%€45,000,000€50,000,000
03Site access & enabling works4%€100,000,000€150,000,000
04Civil structures & industrial halls8%€200,000,000€350,000,000
05Receiving, sorting & feed preparation12%€300,000,000€650,000,000
06VORTEX production & powder refinement14%€350,000,000€1,000,000,000
07Energy infrastructure & manufacturing12%€300,000,000€1,300,000,000
08Advanced materials & 3D manufacturing10%€250,000,000€1,550,000,000
09Living campus for 5,000+ people12%€300,000,000€1,850,000,000
10University, healthcare & innovation10%€250,000,000€2,100,000,000
11Distribution, digital systems & integration10%€250,000,000€2,350,000,000
12Integrated commissioning & handover6%€150,000,000€2,500,000,000
Total programme€2,500,000,000€2,500,000,000

Budget envelopes are not supplier quotations or evidence of funds received. Each package includes its allocated delivery and risk allowance; no additional contingency is added to the displayed total. Tax, land acquisition treatment and contract terms remain to be resolved within the agreed cost baseline.

The €2.5 billion is the overall programme envelope. Incurred costs, current commitments and remaining work must be reconciled within the 12 allocations before a further phase charge is released. The tranche schedule is not an additional €2.5 billion on top of historical spending.

Programme basis

Vision supported by a clear delivery brief.

100 hectares · planning allocation

Proposed 100-hectare onshore allocation: 30 ha processing and manufacturing; 12 ha energy and utilities; 10 ha onshore logistics; 8 ha laboratories and education; 25 ha living campus; 5 ha civic and healthcare; 10 ha landscape and buffers. Harbour water areas and marine works are separately defined. Hall counts, rail geometry and dock arrangements require an integrated land-and-water masterplan.

5,000+ people · design target

Housing, water, wastewater, mobility, food, healthcare and emergency access must be sized together. The target does not mean 5,000 jobs or occupied homes already exist.

Technology qualification

The equipment manual describes dry-material milling, compressed-air services, separation and filtration. Powder size, throughput, energy consumption and product suitability must be measured for each qualified feedstock. HMD energy systems remain a development and test package until demonstrated.

Evidence discipline

The programme began in 2005 and its scope has continued to evolve. Historic documents describe €5m, €200m and €2bn stages, while the press article refers to a 500,000-tonne facility and other papers mention larger expansion targets. These are not presented as a single proven capacity. This 12-phase programme uses the owner’s current €2.5bn brief.

Source documents and editorial decisions

D1 — 11322905The projectDev.pdf (2 pages): project participants and original development stages.
D2 — ITALIAN PROTOTYPING NANOPOWDER FROM WASTE PROJECT.pdf (92 pages): prototype budget, equipment, operating manual and supporting records.
D3 — 310820263908ProjectDescriptionCompress1(2).pdf (20 pages): the broader industrial, energy, manufacturing and social-infrastructure vision.

The waste-to-petrol concept and the pyrolysis material in the historical appendix are superseded and will not be executed under this programme. They are retained only as historical source context. The active programme started in 2005 and continues with ongoing expenditure covered by the GENESIS Green Bond, as confirmed by the project sponsor. Supplier references and certificates do not establish appointment to the new coastal works.

Current location, land area, population target and programme total come from the owner’s brief. Phase sequencing, allocations, responsibilities and acceptance milestones are proposed editorial / delivery planning.

Read the AVIS.Land project article →

D4 — 18012026390810ProjectSumary.pdf (73 pages): AVIS international-reference harbour, process-hall, robotic printing and tower designs. Its Colombia location, historic budgets, capacities and performance claims are not adopted as verified facts for Italy. Latest owner brief adds 250 × 250 m halls, 500 VORTEX mills and large harbour / shipping interfaces.