AVIS process halls & structural construction
Construct the foundations, industrial shells, service buildings and equipment access needed for a modular materials and manufacturing campus. Building readiness drives equipment delivery, rather than the reverse.
Scope of delivery
- Engineer the principal 250 × 250 m waste-processing hall envelope
- Develop foundations, multi-lobed roof structures and heavy equipment supports
- Coordinate truck, rail and material-transfer interfaces with the hall structure
- Deliver fire-separated process wings, maintenance access and installation zones
What this phase hands over
- Structural inspection and test records
- Weather-tight halls and released installation zones
- Equipment foundation and anchor surveys
- Building-to-process interface handover
Part of the active programme
The programme began in 2005 and continues through 2026 with ongoing development activity and expenditure. Its former waste-to-petrol route will not be executed. The current programme develops waste-to-nanopowder, advanced manufacturing, alternative-energy systems and the supporting campus infrastructure.
Programme expenditure is covered by the GENESIS Green Bond.
The project is now moving onto the AVIS platform to bring industrial companies, engineering teams and universities into coordinated delivery packages. Participants contribute manufacturing capability, engineering, research, testing and training through defined scopes and interfaces.