Existing AVIS container-VORTEX industrial reference for the Nigerian regional facilities AVIS architectural and industrial vision

Recover and transform

Three regional engines of production.

Three €50 million regional industries connect local recovery with the central technology park. Each combines containerised processing, utilities, material logistics and an electric collection fleet.

The same complete delivery sequence in each region

Parks A, B and C each follow five €10 million milestones. This creates a repeatable construction and commissioning model while allowing each location to serve its own collection network and material supply.

Build

Prepare the site and access, install container facilities and utilities, then install the processing equipment.

Connect

Commission the electric fleet, material-transfer arrangements and links to the central park.

Operate

Train the regional team, run production trials and complete operational handover.

  1. Site
  2. Facilities and utilities
  3. Processing equipment
  4. Electric fleet
  5. Commissioning

Related construction milestones